3
Connect the other end of the cable to port A in the top I/O module of the storage
shelf.
4
Be sure that the blue clip on the end of the connector in the storage shelf points
down.
Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Connecting one storage shelf to an appliance
96
Summary of Contents for NetBackup 5240
Page 4: ......
Page 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Page 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Page 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Page 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...