12
Be sure that the blue clips on the connectors in both ports point up.
13
Connect a SAS-3 cable to port B of the bottom I/O module in the second shelf.
Connect the other end of the cable to port A on the bottom I/O module in the
first shelf.
Next, connect network and power cables. Turn on the storage shelves and the
appliance per the required sequence. Verify that all units are functioning correctly.
Connecting four storage shelves to an appliance
Note:
The cables in the following diagrams are shown in different colors for
demonstration purposes only. The actual cables are black.
107
Adding one or more storage shelves to an operating 4TB appliance that does not have any storage shelves
Connecting four storage shelves to an appliance
Summary of Contents for NetBackup 5240
Page 4: ......
Page 22: ...Preinstallation requirements Prerequisites for IPMI configuration 22 ...
Page 42: ...Installation procedures Connecting a 4TB appliance to more than one storage shelf 42 ...
Page 43: ...43 Installation procedures Connecting a 4TB appliance to more than one storage shelf ...
Page 66: ...Installation procedures Accessing and using the Veritas Remote Management interface 66 ...