P-10
03/2006
Calibration Test Vend w/pdt:
Allows the vendor to do a self- test of all positions including running the Hopper Flap and
Hopper Bucket.
1. Enter on Button 4 – Calibration – Test Vend w/pdt Dsbl
2. Enter on Button 4 again – Dsbl flashes
3. Advance on Button 2 to All
4. Press Button 4 to ‘save’ setting – Display will read - Please close the Door followed by
Press 1 – Accept
5. Press Button 1 to start the Test Vend process
Calibration Get Failures:
While self-testing, the PDC creates a log of errors it encounters. This function allows you to step
through these errors. For each location on the shelf
●
indicates success while
○
indicates a
failure.
Example: │
●●|●●|●●|●●|
1. Press Button 4 to scroll to shelves to view any failures
2. Press Button 1 to exit
Calibration Set # of Trays:
Allows the operator to ‘choose’ the number of ‘Trays’ in the vendor.
1. Enter on Button 4 – ‘Set # of Trays 3, 4 or 5’
2. Enter on Button 4 – ‘3, 4 or 5’ is flashing
3. Advance on Button 2 to desired Tray Setting that matches the vendor
4. Press Button 4 to ‘save’ setting
5. Press Button 1 to send the new setting to the Main Controller. Display will read – Please wait
then exit automatically to Calibration – Set # of Trays
*** Number of Trays MUST match the Vendor ***
Calibration Set Z pdt Position:
Allows the operator to adjust the depth that ‘Z’ goes into the vendor to retrieve product.
1. Enter on Button 4 – ‘Set Z pdt Position’. Current position is shown
2. Enter on Button 4 – Current position is flashing
3. Advance on Button 2 to desired product position
4. Press Button 4 to ‘save’ setting
5. Press Button 1 to send the new setting to the Main Controller. Display will read –
Please wait then exit automatically to Calibration – Set Z pdt Position
Summary of Contents for VUE 30
Page 1: ...i 02 2006 TABLE OF CONTENTS...
Page 4: ...S 1 04 2005 SAFETY SECTION...
Page 7: ...S 4 04 2005 FIGURE 1...
Page 12: ...S 9 04 2005 FIGURE 3 8 0 AMP FUSE 3 15 AMP FUSE...
Page 20: ...S 17 04 2005 NOTES...
Page 21: ...G 1 04 2005 GENERAL INFORMATION SECTION...
Page 28: ...G 8 04 2005 NOTES...
Page 29: ...P 1 03 2006 VEC 15 PROGRAMMING SECTION...
Page 57: ...P 29 03 2006 NOTES...
Page 58: ...C 1 04 2006 CABINET SECTION...
Page 59: ...C 2 04 2006 1 2 3 4 5 6 7 8 3 9 10 12 13 14 13 13 16 15 11 18 19...
Page 63: ...C 6 04 2006 17 3 4 6 5 7 8 9 10 13 12 11 14 15 15 15 15 2 16 1...
Page 65: ...C 8 04 2006 19 20 15 3 16 9 15 13 11 10 12 14 2 8 15 6 5 4 7 15 1...
Page 68: ...C 11 04 2006 NOTES...
Page 69: ...ST 1 04 2006 SHELVES TRAYS PARTS SECTION...
Page 71: ...ST 3 04 2006 6 12 14 7 3 13 15 11 5 5 4 10 8 2 1 9 18 19 20 17 16 20 19 19...
Page 73: ...ST 5 04 2006 NOTES...
Page 74: ...D 1 05 2006 DOOR PARTS SECTION...
Page 75: ...D 2 05 2006 1 3 10 10 11 11 9 4 8 7 6 5 12 13 2...
Page 79: ...D 6 05 2006 1 2 3 9 8 13 12 13 11 17 16 15 14 5 4 7 6 10...
Page 82: ...D 9 05 2006 3 2 4 6 9 7 5 8 1127330 1125079 8 PTION PTION 1...
Page 84: ...D 11 05 2006 9 0QUJPO 1127330 1125080 1127891 1125941 8 PTION...
Page 88: ...D 15 05 2006 9 10 5 2 5 6 4 3 8 7 11 1...
Page 91: ...D 18 05 2006 1 7 10 8 9 12 12 3 2 5 6 11 12 13...
Page 95: ...D 22 05 2006 1 5 11 12 13 6 9 8 3 14 2 4 7 10 9 15 13 12...
Page 98: ...D 25 05 2006...
Page 99: ...M 1 04 2005 MAINTENANCE SECTION...
Page 107: ...M 9 04 2005 NOTES...
Page 129: ...PDC Hand Assembly...
Page 141: ......