Table of Contents
iv
Figures
................................................................................1
..................................................................2
.....................................................................2
Guide Tube/Water Intake Device
............................................................3
Guide Tube Installation Example - Tank Tilting Away From Manway
Guide Tube Installation Example - Tank tIlting Toward
Short End Of The Tank
.........................................................................12
........................................................................................13
Securing WID Flange To Guide Tube Flange
.......................................13
FC Inlet/Outlet Valve Electrical Conduit Installation
.............................14
FC Loosening Inlet/Outlet Valve Conduit Connection
.....................................................................................15
Locating TRJ Siphon Port Plugs
...........................................................16
........................................................16
.........................................................17
.............................................................17
.............................................................18
..............................................................18
............................................................19
........................................................................20
...................................................................................21
...............................................................................21
........................................................................21
Epoxy Sealing FC Mag Probe and FC Pressure Sensor
Field Connections
.................................................................................23
FE Petro SCI/Mag VFC Controller DIP Switch Locations
Wiring Using Red Jacket Isolation
........................................................25
Wiring Using an FE Petro DHI Box
.......................................................26
Wiring Using an CPI Isolation Board
....................................................27
Converting a TLS-350 to a TLS-450PLUS
...........................................28
Adding Red Jacket Isotrol to a Pre Wired Control Panel
Adding FE DHI to a Pre-Wired Control Panel
.......................................30
..........................................................................32
FC Mag Probe/Pressure Sensor Connection to TLS-450PLUS
RS-232 Connections FCC to TLS-450PLUS
........................................33
Tables
HydrX System Parts List ..........................................................................4
HydrX System Spare Parts List ..............................................................34