![Vatech Green X Installation Manual Download Page 90](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326090.webp)
6. Finalizing the X-ray Unit Installation
82 Green X / X18 (Model: PHT-75CHS) Installation Manual
6.4
Covering Bolts with Caps
To cover bolts around the equipment:
1. Cover bolts on the wall bracket and the CEPH arm (optional) with wall mount
caps.
Parts and
Accessory
Wall mount cap
12 pcs
(Part No. 32)
2. Attach the
vertical top cover
with M4x10 truss bolts and cover each bolthead
with a silicone cap.
Parts and
Accessory
Truss Bolt
M4x10 – 7 pcs
(Part No. 33)
Silicone cap
7 pcs
(Part No. 16)
Summary of Contents for Green X
Page 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Page 2: ......
Page 8: ......
Page 144: ......
Page 164: ...com...