![Vatech Green X Installation Manual Download Page 88](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326088.webp)
6. Finalizing the X-ray Unit Installation
80 Green X / X18 (Model: PHT-75CHS) Installation Manual
6.3
Attaching the Switch Holders
Follow the steps in
6.3.1
and
6.3.2
to attach up/down switch holders.
6.3.1 Attaching UP / DOWN Switch Holder
To attach the up/down switch holder:
Parts and
Accessory
UP / DOWN
Switch Holder
1 pc
(Part No. 33)
UP / DOWN
Switch
Optional - 1 pc
(Part No. 33)
Truss Bolt
M4 x 10 – 2 pcs
(Part No. 33)
1. Attach the Up/Down switch holder to the handle frame with M4x10 truss bolts.
2. Connect the Up/Down switch to the X-ray unit and hang the switch on the
holder.
Summary of Contents for Green X
Page 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Page 2: ......
Page 8: ......
Page 144: ......
Page 164: ...com...