![Vatech Green X Installation Manual Download Page 39](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326039.webp)
3. Before the Installation
Green X / X18
(Model: PHT-75CHS) Installation Manual 31
En
glis
h
3.4
Transporting the X-ray Unit
To transport the X-ray Unit:
At a minimum, three persons are required to lift and
carry the X-ray unit.
1. Tape the column to attach it to the foam.
2. Grab the handles and lift the X-ray unit (main unit) from the pallet.
3.
Place the X-ray unit with EPS
(Main Base)
on a transport dolly and carry
the unit to the installation site.
When putting the Main Unit on the dolly, ensure that
the center of the mass indicator is aligned with the
center of the dolly.
If you move the unit manually, ensure that the
person holding the upper handle takes the lead.
Summary of Contents for Green X
Page 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Page 2: ......
Page 8: ......
Page 144: ......
Page 164: ...com...