![Vatech Green X Installation Manual Download Page 66](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326066.webp)
4. Installing the X-ray Unit: Base Stand Type
58 Green X / X18 (Model: PHT-75CHS) Installation Manual
4.5
Connecting the Cables to the Equipment
To connect the cables to the equipment:
1. Connect the cables in the back of the column as shown in the figure.
Parts and
Accessory
Optic Cable
Cable No.
H000014A
(Part No. 21)
Cable Tie
(Part No. 20)
Exposure Switch
(Part No. 2)
Summary of Contents for Green X
Page 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Page 2: ......
Page 8: ......
Page 144: ......
Page 164: ...com...