![Vatech Green X Installation Manual Download Page 54](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326054.webp)
4. Installing the X-ray Unit: Base Stand Type
46 Green X / X18 (Model: PHT-75CHS) Installation Manual
4.2
Installing the CEPH Unit (Optional)
To Install the CEPH unit:
1. Take out the CEPH unit from the CEPH box.
2. Remove the plastic wrap covering the unit and CEPH cables with a cutter.
3. Attach the CEPH unit to the main unit by sliding four studs into arm holes.
Ensure that the CEPH cables come out of the CEPH
armhole as below.
Summary of Contents for Green X
Page 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Page 2: ......
Page 8: ......
Page 144: ......
Page 164: ...com...