Revision: 2
Date: 11-15-19
VASHON AIRCRAFT RANGER R7 MAINTENANCE MANUAL
Page: 1-3
this manual comply with the intent of FAA 14 CFR Part 43.3 with regard to preventive
maintenance.
PREVENTIVE MAINTENANCE
This manual identifies the Ranger
’s
preventive maintenance tasks, which are to be
accomplished by qualified personnel, and include the actions for the 100-hour inspection and
the annual inspection.
CORRECTIVE MAINTENANCE AND ALTERATIONS
This manual identifies the line maintenance, minor repair, and minor alteration tasks that can
be accomplished by a holder of an LSA repairman certificate with either an inspection or
maintenance rating. Furthermore, it also instructs on heavy maintenance tasks that require a
certified airframe and powerplant mechanic and the approval of Vashon Aircraft to perform.
No major repairs, or major alterations, as outlined in ASTM F2483 Sections 7 through 9, or in
this maintenance manual, are authorized at this time for the Ranger aircraft.
Any major repairs, or major alterations, as outlined in ASTM F2483 Sections 7 through 9 can
only be performed by Vashon Aircraft or only as provided by Vashon Aircraft
’
s approved
engineering data.