Date
:
11-15-19
Revision: 2
5.7.3-8
VASHON AIRCRAFT RANGER R7 MAINTENANCE MANUAL
(b)
Visually inspect interior of fuselage of structure for cleanliness, damage,
missing/loose rivets, and corrosion.
(c)
Visually inspect flight control linkage for wear, security of attachment,
binding/interference.
(3)
INSTALLATION
(a)
Installation of the components are the reverse of their removal.
DOORS
Required Tools:
No special tools are required for this operation.
Parts Required:
No parts are required at this time.
Level of Maintenance:
Line Maintenance.
Certification Required:
Please see Table 5.4.3 in Section 5.4.
(1)
DOOR REMOVAL
(a) Unfasten the two hinges that connects the door to the fuselage.