Revision: 2
Date: 11-15-19
VASHON AIRCRAFT RANGER R7 MAINTENANCE MANUAL
5.4-1
MAINTENANCE OVERVIEW, SERVICING OF FLUIDS, AND PERSONNEL
AUTHORIZATION
TABLE OF CONTENTS
100 HOUR INSPECTION
5.4-2
CONDITION INSPECTION
5.4-2
SERVICING OF FLUIDS
5.4-2
REPLACEMENT INTERVALS
5.4-6
AUTHORIZATION TO PERFORM LINE MAINTENANCE, REPAIRS, ALTERATIONS, & INSPECTIONS
5.4-8
FAA AUTHORIZATION FOR PILOT/OWNER TO PERFORM LINE MAINTENANCE TASKS
5.4-11