
Installation
89
Software configuration
Initial commissioning is supported by the
internal installation wizard. It is started
automatically when the installer logs in for
the first time.
10.9.1.
Start page of the installation wizard
First, the current sensor configuration
needs to be selected.
Depending on your selection, the energy
storage system is set to the respective
mode (normal operation or cascade).
To continue with configuration:
Check the provided information and
enable the respective options.
Afterwards, select
"Start".
10.9.2.
Basic settings
In the
first
step, the basic settings must be
checked and adjusted as necessary.
Make sure that
date
,
time
and the
time
zone
are configured correctly. The
device
name
can be changed any time.
Afterwards, select
"Continue".
Summary of Contents for Pulse neo Series
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo...
Page 2: ...Leerseite Pagina vuota Page blanche Blank page...
Page 4: ...Leerseite Pagina vuota Page blanche Blank page...
Page 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label...
Page 64: ...Installation 64 Three Phase Single Phase Not permitted...
Page 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate...
Page 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system...
Page 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger...
Page 147: ...Subject to modification Appendix 3 Connection diagram of TN C system...
Page 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger...