Servicing
108
If all points are complied with:
Lift the hood over the mounting plate
at an angle of 45°.
Carefully lower the hood until the rear
is engaged at the mounting plate.
Connect the PE conductor between
the hood and battery inverter.
Check the electrical connection
between hood and central earthing
point by continuity testing.
Swivel the hood to the device.
Observe the position of the
ON/OFF switch.
Make sure that no lines are
jammed!
The spring must click into place!
Close the energy storage system with
the three included screws at the
bottom.
Checking the PE connection
Summary of Contents for Pulse neo Series
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo...
Page 2: ...Leerseite Pagina vuota Page blanche Blank page...
Page 4: ...Leerseite Pagina vuota Page blanche Blank page...
Page 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label...
Page 64: ...Installation 64 Three Phase Single Phase Not permitted...
Page 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate...
Page 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system...
Page 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger...
Page 147: ...Subject to modification Appendix 3 Connection diagram of TN C system...
Page 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger...