![Varta Pulse neo Series Operating Manual Download Page 61](http://html1.mh-extra.com/html/varta/pulse-neo-series/pulse-neo-series_operating-manual_3597970061.webp)
Installation
61
ATTENTION
Mixed-up phases.
Disturbing of charging and discharging
function.
Conductors L1, L2, L3 for building
connection and PV current sensor must
have an identical phase assignment.
Ensure
clockwise phase sequence
of
the connection.
ATTENTION
Disturbance of magnetic cores.
The current sensor is damaged.
Do not touch the magnetic cores.
Ensure a clean working environment.
To ensure optimisation of self-
consumption, the building current sensor
must record all values regarding the feed.
For this reason, it is directly positioned
downstream of the consumption/feed
meter. The VARTA Split Core current
sensor includes a connection box and
three foldable transformers. Their nominal
current is 50 A (100 A maximum) per
phase. The connection box is designed for
DIN rail installation. The connection of the
included sensor cable to the energy
storage system is located at the
Summary of Contents for Pulse neo Series
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo...
Page 2: ...Leerseite Pagina vuota Page blanche Blank page...
Page 4: ...Leerseite Pagina vuota Page blanche Blank page...
Page 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label...
Page 64: ...Installation 64 Three Phase Single Phase Not permitted...
Page 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate...
Page 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system...
Page 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger...
Page 147: ...Subject to modification Appendix 3 Connection diagram of TN C system...
Page 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger...