![Varta Pulse neo Series Operating Manual Download Page 131](http://html1.mh-extra.com/html/varta/pulse-neo-series/pulse-neo-series_operating-manual_3597970131.webp)
Documentation
131
Servicing*
P
Comments
Outside check:
Air vents at right side of enclosure
cleaned.
Openings are not covered or
clogged.
m
Room temperature of 5 - 30°C, all-
year
m
LED indicator at ON/OFF switch
green
m
ON/OFF switch: Function checked
m
Via web-interface:
Online status "connected"
m
Software version
Ver.:
Air filter counter reset
m
Error memory read-out
m
Software update (of offline system)
m
Enclosure interior:
Grid at air filter cleaned
m
Air filter checked/replaced**
m
Completion:
PE conductor checked
m
Hood screw-fitted
m
Fuse switched-on
m
Energy storage system activated /
function checked
m
*For a detailed description of servicing, refer to section
"Servicing" in the operating manual.
**The air filter must be replaced on every other servicing.
Summary of Contents for Pulse neo Series
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo...
Page 2: ...Leerseite Pagina vuota Page blanche Blank page...
Page 4: ...Leerseite Pagina vuota Page blanche Blank page...
Page 32: ...General information 32 2 4 2 ID label of battery module 2 4 3 Unlock code label...
Page 64: ...Installation 64 Three Phase Single Phase Not permitted...
Page 67: ...Installation 67 All Dimensions in mm Fig 2 Dimensions at the mounting plate...
Page 145: ...Subject to modification Appendix Appendix 1 Connection diagram of TT system...
Page 146: ...Subject to modification Appendix 2 Connection diagram of TT system with data logger...
Page 147: ...Subject to modification Appendix 3 Connection diagram of TN C system...
Page 148: ...Subject to modification Appendix 4 Connection diagram of TN C system with data logger...