Rev: 06.28.18
Page 12
CCD-0001519
Basic Jack Operation
Press "EXTEND" ( Fig. 7E) or "RETRACT" (Fig. 7A). Press "FRONT" arrow (Fig. 7B) to operate front jacks.
Press "RETRACT". Press "REAR" arrow (Fig. 7G) to operate rear jacks.
Press "AUTO LEVEL" (Fig. 7H) to start auto level sequence.
If the OneControl Touch Panel is in manual mode press, "EXTEND" (Fig. 7E) or "RETRACT"(Fig. 7A). Press "LEFT" (Fig.
7C), "RIGHT" (Fig. 7F) or "REAR" (Fig. 7G) arrow to operate left, right or rear jacks.
Unhitching Instructions
NOTE: Prior to unhitching from the tow vehicle, ensure the trailer is parked on a level surface and chock the
tires of the trailer.
1. Extend the inner legs of both front jacks (landing gear) to within 4-5" of the ground by pulling on the
quick-release pins.
2. Turn the Linc remote on (Fig. 7I) and enter a PIN code to turn system on.
3. Press the "LEVELER" button.
4. Press "EXTEND" (Fig. 7E) and "FRONT" arrow (Fig. 7B) to extend front jacks and lift the front of trailer to
take the weight of the trailer off of the hitch.
5. Uncouple the trailer connection on the tow vehicle.
6. Pull tow vehicle away and park at a safe distance.
Auto Level
1. After unhitching from the tow vehicle and parking the vehicle a safe distance away from the trailer,
press the “ON/OFF” button (Fig. 7I) on the Linc remote if the Linc is not on.
2. Enter a PIN.
3. Choose the "LEVELER" option.
4. Press “AUTO LEVEL” (Fig. 7H).
NOTE: Once the automatic leveling cycle has been started, it is important that there is no movement in the
trailer until the trailer has completed the leveling process. Failure to remain still during the leveling
cycle could have an effect on the performance of the leveling system.
Auto Level Sequence
1. When Auto Level Sequence begins, the front of the trailer will seek a position near a level state.
2. Rear jacks will be grounded.
3. A side-to-side leveling sequence will occur.
NOTE: At this point on the 6 point system, the 2 middle jacks will be grounded to stabilize the trailer.
These 2 jacks do not level the trailer.
4. Each jack will perform a final grounding touch.
NOTE: If the AUTO LEVEL sequence does not perform as described above, locate the OneControl Touch
Panel inside the trailer or use the OneControl App to place the system in manual mode. Test that
the jacks operate correctly by pushing their corresponding buttons on the OneControl Touch Panel
or App; e.g., "FRONT" button operates only the front jacks, etc. (See "Operation - OneControl Touch
Panel" or "Operation - OneControl App" in this manual).
NOTE: There is no Hitch Recognition sequence programmed for the Linc remote.
Rev: 06.28.18
Page 13
CCD-0001519
Red/Green LED Indicator on Auto Leveling Control Touch Pad
(Rev. B)
Troubleshooting
Red/Green LED Indicator on Auto Leveling Control Touch Pad
(Rev. A)
What Is Happening?
Why?
Off
Touch pad is locked.
Solid Green
Touch pad is active.
Blinking Green
Jacks are moving.
Solid Red
Low battery.
Blinking Red
Error - Refer to OneControl Touch Panel or the OneControl App for the specific
error, then consult the Troubleshooting section of this manual to clear the error.
What Is Happening?
Why?
Off
Touch pad is locked.
Solid Green
Touch pad is active.
Blinking Green
Jacks are moving.
Solid Red
Low battery.
Blinking Red
Error - Refer to OneControl Touch Panel or the OneControl App for the
specific error, then consult the Troubleshooting section of this manual to
clear the error.
Slowly Blinking
Faded Red
(Red and
Green Blinking
Simultaneously)
Error - Refer to OneControl Touch Panel or the OneControl App for the
specific jack error code, then consult the Special Jack Error Code section of
this manual to clear the error.
7 0
Summary of Contents for PINECREST
Page 1: ...O W N E R S M A N U A L B U I LT A R O U N D Y O U...
Page 2: ......
Page 4: ...P I N E C R E S T O W N E R S M A N U A L P I N E C R E S T O W N E R S M A N U A L...
Page 152: ...P I N E C R E S T O W N E R S M A N U A L C U S T O M E R N O T E S N O T E S...
Page 153: ...1 5 3 N O T E S...
Page 157: ...1 5 7...