AIR N ARC
®
200 SERIES ALL-IN-ONE POWER SYSTEM
®
SECTION 6: MAINTENANCE
090019-OP_r0
PAGE - 89
6.5.7.7, Routing Compressor Belts Onto
Pulley Grooves
to reset the compressor
drive belts. Refer to
Section 6.5.7.3, Re-
tensioning the Compressor Drive Belts
to
assure that the compressor belts are
properly tensioned.
6. After the compressor belts have been reset
and their tensions confirmed, replace the belt
guard shield as per
Section 6.5.7.2,
Replacing the Belt Guard Shield
.
6.5.8 DRAINING THE AIR TANK
The air tank reservoir may accumulate a moisture build-
up on the inside due to the compression of air. The air
tank should be checked daily and allowed to drain by
opening the drain cock on the tank valve. For areas of
high ambient moisture content the valve may need to be
checked more than once per day. This valve may be
accessed at any time, including while the machine is in
operation.
6.5.9 ENGINE MAINTENANCE
Although engine routine maintenance is covered in this
operation manual, maintenance personnel should also
refer to the Engine Operator’s Manual when addressing
any engine issues on the Air N Arc 200 Series All-In-One
Power System. Refer to
Figure 6-19
for a location
overview of routine maintenance items for the engine.
NOTE
After generator belt has been replaced,
the compressor belts will have to be re-
established. Always recheck compressor
belt tension after resetting the
compressor belts on the pulleys (refer to
Section 6.5.7.3).
System Operation Group
Manual Section
Location
Engine Maintenance
6.5.9
page 89
Engine Air Filter Maintenance
6.5.9.1
page 90
Checking the Engine Oil
6.5.9.2
page 91
Replacing the Engine Oil
6.5.9.3
page 93
Replacing the In-line Fuel Filter
6.5.9.4
page 94
Checking the Engine Cooler
6.5.9.5
page 95
WARNING
Before performing maintenance or repair
operations on the machine, ensure that
all power has been removed and locked
out to prevent accidental start-up.
WARNING
Relieve pressure from the compressor
system before performing maintenance
on any components.
NOTE
If a new generator belt is installed,
recheck the tension after 10-20 hours of
operation, and re-tension if necessary.