Chapter 3 ________________________________________________________________ Installation
VAISALA ________________________________________________________________________ 79
9901-011
Figure 72
Assembling QMR102 on the Ground with
Pedestal Plate
4.
Connect the signal cable (4) to MAWS. For the cabling, see
Table 11 on page 72.
5.
Continue from section Finalizing the Installation below
Finalizing the Installation
Finalize the installation as described in the following steps:
1.
To be able to release the rain gauge's tipping bucket mechanism,
and adjust the level, first remove the funnel from its base by
unscrewing the three plastic thumbscrews (1). See Figure 73
below.
0201-036
Figure 73
Funnel Fixing Screw
2.
Remove the piece of foam (2) from under the bucket
mechanism. This foam may be saved and used whenever the
rain gauge is moved. See Figure 74 on page 80.