8
PR-23 instruction manual
2.2.3 Check list for pipe mounting
Most PR-23 refractometer models are mounted in a pipe. The recommended mini-
mum flow velocity of 1.5 m/s (5 ft/s). The diameter and form of the pipe and the
process temperature all affect the measurement and need to be taken into account.
1. If the process pipe diameter varies, select the
position with the smallest diameter
(and accordingly highest velocity). Then the prism keeps better clean.
2. If the refractometer is used in a feed-back control loop,
make the time lag short
. E.g.
when a dilution valve is controlled, mount the refractometer close to the dilution
point. However, make sure complete mixing has occurred at mounting location.
3. If the temperature varies along the process pipe, select the
position with the highest
process temperature
. Then the risk of prism coating is minimized, because higher
temperature means higher solubility and also lower viscosity.
4. Often the
position with the highest process pressure
(= after pump + before valve)
has favorable flow conditions without sedimentation or air trapping risks.
5. The sensor should be conveniently accessible for service.
2.2.4 Check list for mounting in a tank, a vessel or a large pipe
A probe sensor PR-23-AP or PR-23-GP can be inserted with a flange or clamp into
tanks and vessels which either don’t have a scraper or where the mixer doesn’t touch
the vessel wall. A probe sensor can also be flush mounted in a cooker where the
scraper touches the wall.
1. The inserted probe sensor is mounted close to a stirrer to ensure representative
sample of the process liquid and to keep the prism clean.
2. The sensor should be conveniently accessible for service.
Summary of Contents for K-PATENTS PR-23 Series
Page 1: ...IM EN PR23 v 2 00 Instruction Manual Vaisala K PATENTS Process Refractometer PR 23...
Page 2: ......
Page 4: ......
Page 17: ...2 Inline refractometer sensor 7 2 2 2 PR 23 mounting guide...
Page 26: ...16 PR 23 instruction manual...
Page 29: ...4 Prism wash systems 19 Figure 4 1 A prism wash system for steam non sanitary...
Page 30: ...20 PR 23 instruction manual Figure 4 2 A sanitary prism wash system for steam...
Page 32: ...22 PR 23 instruction manual Figure 4 5 Wiring for a prism wash system for steam...
Page 33: ...4 Prism wash systems 23 Figure 4 6 A prism wash system for high pressure water non sanitary...
Page 34: ...24 PR 23 instruction manual Figure 4 7 A sanitary prism wash system for high pressure water...
Page 35: ...4 Prism wash systems 25 Figure 4 8 Wiring for a prism wash system for high pressure water...
Page 40: ...30 PR 23 instruction manual...
Page 50: ...40 PR 23 instruction manual...
Page 72: ...62 PR 23 instruction manual...
Page 174: ...164 PR 23 instruction manual...
Page 179: ...11 Safe Drive 169 11 3 3 Safe Drive steam wash system parts...
Page 186: ...176 PR 23 instruction manual 11 4 2 Wiring Figure 11 9 PR 23 SD system wiring...
Page 204: ...194 PR 23 instruction manual Figure 11 19 Markings on the retractor handle...
Page 206: ...196 PR 23 instruction manual...
Page 218: ...208 PR 23 instruction manual...
Page 226: ...216 PR 23 instruction manual...
Page 230: ...220 PR 23 instruction manual...
Page 232: ...222...
Page 238: ...228...
Page 240: ...230...
Page 242: ...232...
Page 244: ...234...
Page 246: ...www vaisala com...