INSTALLATION PLACE
Select installation site according to below
requirements:
(1) The height of the installation position should
ensure that the line of sight is on the same level
as the LCD for viewing the parameters inverter
conveniently.
BEFORE INSTALLATION
Installation tools
Table of detailed delivery list of single-phase inverter
Table of tools list
Figure 8 Optimal mounting height
No.
Na me
Qua ntity
1
5kW / 8kW / 10kW inverter
1
2
Installation bracket
1
3
Operation manual
1
4
Assembling bolts M5*20
2
5
Expansion bolts M6*50
4
6
Communication connector
1
7
DC connector
2 pairs / 1 pair
(
4kW- S
、
5kW- S
)
8
AC connector
1
No.
Insta lla tion tools
Instruc tion
1
Marker
Mark the installation hole
2
Electric drill
Drill holes on the bracket or on the wall
3
Hammer
Knock on the expansion bolt
4
Adjustable wrench
Fix the installation bracket
5
Inner hex screwdriver
Tighten the anti- theft screw and
disassemble AC junction box
6
“ Slotted” or “ cross- head” screwdriver
AC wiring
7
Megameter
Measure the insulation performance and
grounding impedance
8
Multimeter
Check the circuit and measure AC/DC
voltage
9
Electric soldering iron
Solder the communication cable
10
Wire crimper
Crimp DC terminal