39
1. Loosen the screws (6-41/1+2) and remove the acrylic sheet.
2. Loosen the screws of the sheet mount. The sheet mount folds downward at its hinge.
3. Move the filter glass by applying light pressure against the sheet mount until you can remove
the filter pad from the mount.
4. Insert the new filter glass.
Make absolutely certain to use the correct number
and type of filter glass
according to the unit-specific configuration listed on
the previous page.
Failure to observe will result in a risk of burning!
Always insert the coated filter glass
(type 326 or type 322) first in such a way that the uwe
logo can be read correctly from the bed after assembly. When
positioned in this way, the coated side faces the HP lamp.
5. Move back the sheet mount and screw in the screws for the sheet
mount.
6. Clean the acrylic sheet from the inside and mount the new acrylic sheet.
Observe the cleaning instructions
7. Screw down the new acrylic sheet with the screws.
8. Clean the acrylic sheet from the outside.
9.7 Breeze
Servicing the BREEZE system
The BREEZE lines must be bled during the initial commissioning, following service work on the
BREEZE system and after changing the tank.
Bleeding the BREEZE lines
Follow the instructions as described in Chapter 8.6
under program PrP5.
BREEZE-system faults
Fault indicators
When the preset service interval of the BREEZE system is
reached, the right decimal point illuminates (6-43/1). BREEZE
has the following special feature:
Summary of Contents for P90
Page 1: ...1 Operating and Assembly Instructions Model P90 ...
Page 16: ...16 ...
Page 30: ...30 8 6 Service menu diagram ...
Page 67: ...67 12 2 Labels attached to the tanning device representative model ...
Page 68: ...68 ...
Page 72: ...72 14 WARRANTY CARD ...
Page 77: ...77 ID NR 293 323 12 15 ...