17
4.9 Aroma - Not Applicable
4.10 Breeze connections
Connecting the BREEZE tank
On delivery from the factory, the BREEZE tank is not yet
connected. The closed tank is transported in the front
part of the foot area in its later location.
1. Unlock the two acrylic locks on the acrylic sheet
bed with the Allen key and raise the bed
upward. The acrylic sheet bed is held in open
position by the two gas springs.
2. Unlock the front apron with the Allen key and
lower the front apron forward.
3. Remove the BREEZE tank.
4. Unscrew the cover of the full BREEZE tank (3-8/3).
5. Screw the cover (3-8/2) with the line
connection onto the full tank. The line may
turn as the cover is screwed tight.
6. Move the full BREEZE tank into the base frame
7. Close the front apron and lock it.
8. Press the acrylic sheet bed downward and
lock the two acrylic locks with the Allen key.
5. Start-up
Before switching on for the first time:
-
Determine the pre-settings for the device in the service menu.
-
Check correct installation of fluorescent tubes. The tube labeling must be visible, otherwise
no tanning effect may be obtained.
-
Store these Operating Instructions in a place that allows for easy access at any time.
5.1 Operating modes
The three different operating modes are explained below:
STANDBY MODE
The tanning device is in an idle state, i.e. it is connected to the mains but is currently not being
used. The tubes and the tanning lamps are switched off. From the standby mode you can
access the service menu.
Summary of Contents for P90
Page 1: ...1 Operating and Assembly Instructions Model P90 ...
Page 16: ...16 ...
Page 30: ...30 8 6 Service menu diagram ...
Page 67: ...67 12 2 Labels attached to the tanning device representative model ...
Page 68: ...68 ...
Page 72: ...72 14 WARRANTY CARD ...
Page 77: ...77 ID NR 293 323 12 15 ...