Hallett Instruction Manual
Released on 8-Aug-19
– GH2B
Page 29
UV Pure Technologies Inc. © 2019
7.
M
AINTENANCE
The disinfection of water will occur as long as the unit is properly maintained
with genuine parts in accordance with the instructions set out in this manual.
Operating a malfunctioning unit or defeating any system sensors may
jeopardize the safety of the water. Online videos are available to help with
typical maintenance tasks.
Test Shutoff Valve Monthly
The optional solenoid shutoff valve should be tested monthly to confirm it
opens and closes. Unplug valve from unit to confirm water stops flowing. Plug
the valve in again to confirm water continues to flow.
Clean Air Filter Periodically
The Hallett contain a washable air filter in the located at the air inlet port (See
Figure 7.1). Periodically check and clean the filter to ensure blower operation
is not impeded.
AIR FILTER
BOTTOM OF UNIT
Figure 7.1
Accessing the UV Chamber
The UV chamber can easily be opened for lamp replacement or quartz sleeve
inspection without having to drain the unit and without any tools.
Caution: Always shutdown and unplug the unit before accessing the
UV
UV
UV
Summary of Contents for Crossfire Technology Hallett 1000NC
Page 50: ...Hallett Instruction Manual Released on 8 Aug 19 GH2B Page 50 UV Pure Technologies Inc 2019...
Page 51: ...Hallett Instruction Manual Released on 8 Aug 19 GH2B Page 51 UV Pure Technologies Inc 2019...
Page 52: ...UV Pure Technologies Inc 455 Milner Ave Unit 1 Toronto Ontario M1B 2K4 www uvpure com...