INSTALLATION
This chapter will explain all the procedures to follow to install the entire system, from the wiring to the assembly of the
devices, from the installation of various options and interfaces in the control panel to bus connections and those of
detectors and output devices.
An explanation of how to open the control panel will be given, how to recognise the various parts of the control panel, of
its expansion modules and interfaces, and of the system devices.
The next chapter explains how to buy the various devices and start up the system.
5.1
INSTALLATION PROCEDURE
The best operation sequence for installing an alarm system with 1067/024, 1067/032A and 1067/052A control panels, in
the least time possible while guaranteeing optimal results, calls for the following steps to be taken:
1. Wiring.
2. Installing the control panel on the wall.
3. Assembly of expansion modules, optional, and accessories in the control panel.
4. Connections in the control panel.
5. Installation and connection of expansion modules, keypads, and readers.
6. Installation and connection of the detectors and alarm and signalling devices.
7. Power supply and acquisition of the devices.
8. Configuration of the system and its testing (procedure illustrated in the Programming Manual).
Nothing prohibits following a different procedure. For example, step 3 can be anticipated, assembling the expansion
modules and interfaces in the control panel in the workshop.
Even steps 7 and 8 can be completed beforehand, in the workshop, using temporary wiring, provided that the various
devices are duly identified with labels so as to be able to subsequently install them correctly on site.
Alternatively, the entire system can be programmed on a PC equipped with FastPro software, saved, and later
downloaded on site from the PC or from a USB pen drive.
5.2
WIRING
Run all the connection cables necessary: bus, detectors, alarm and signalling devices, electric power supply, telephone
connection, eventual audio bus. Before running the cables, check their sizes.
IMPORTANT!
When installing the cables, keep the anti-intrusion system cables separate from the electrical
system of the apartment or office (separate ducts).
IMPORTANT!
In fulfilment of the electrical security standards, the wiring must be done carefully and all the
connection cables must be blocked in position near the terminal board to prevent the Safety Extra Low Voltage
conductors (SELV) from making contact with dangerous live wires (230 V connector terminals).
Block the cables by fixing them with bands to the anchoring points “
F
” (
Summary of Contents for 1067/024
Page 118: ...DS1067 063D 118 LBT20064...
Page 119: ...DS1067 063D 119 LBT20064...