![Uplift Desk Power & Data Rail Installation Instructions Manual Download Page 9](http://html1.mh-extra.com/html/uplift-desk/power-and-data-rail/power-and-data-rail_installation-instructions-manual_1060741009.webp)
© UPLIFT Desk
• 800-349-3839 • 512-614-3152 • [email protected] • upliftdesk.com
9
M5x10 Flat head screw
(qty 6)
120-Degree foot
(qty 3)
3mm Allen wrench
Height setting for
V2-Commercial Frames
Height setting for
V2 Frames
Step 1
The posts are designed with recommended height
setting indicator lines on the Bottom post for UPLIFT
V2 and UPLIFT V2-Commercial desks. Using the in-
cluded 3mm Allen wrench, loosen the the two M6x6
Set screws so the Upper post can slide.
If you are using the Power and Data Rail with UPLIFT
V2-Commercial desks, slide the Upper post until the
bottom edge is aligned with the first indicator line.
For UPLIFT V2 frames, slide the Upper post to the
second indicator line.
Once in place, tighten the Set screws again and con-
tinue this process with the rest of your posts.
Step 2
Using six M5x10 Flat head screws, attach the 120-De
-
gree feet (two screws per foot) as shown to the bot-
tom of each post assembly.
Hand tighten each screw a few turns at first. Once all
screws are started, tighten them with the included
3mm Allen wrench.
Parts needed for this part of the assembly
120-Degree Post Assembly
M6x6 Set screw
(installed in post)
Comes pre-assembled
Consists of:
Upper post
Inner sleeve
(inside)
Bottom post
120-Degree Post
UPLIFT V2 Desks
UPLIFT V2-Commercial Desks