![Uplift Desk Power & Data Rail Installation Instructions Manual Download Page 13](http://html1.mh-extra.com/html/uplift-desk/power-and-data-rail/power-and-data-rail_installation-instructions-manual_1060741013.webp)
© UPLIFT Desk
• 800-349-3839 • 512-614-3152 • [email protected] • upliftdesk.com
13
Step 3
In a 3-Pack configuration, Power infeeds can be intro
-
duced through either the 120-Degree or Square posts
and will require two Jumpers to connect all three Rails.
Follow the Power infeed and Jumper installation pro-
cedures described in Steps 1 and 2 of this section.
You may find it helpful to temporarily detach one of
the Rails in order to feed the Jumpers as shown in the
example to the left. Detaching one Rail will allow ac
-
cess through the open “window” of the 120-Degree
post.