![Uplift Desk Power & Data Rail Installation Instructions Manual Download Page 15](http://html1.mh-extra.com/html/uplift-desk/power-and-data-rail/power-and-data-rail_installation-instructions-manual_1060741015.webp)
© UPLIFT Desk
• 800-349-3839 • 512-614-3152 • [email protected] • upliftdesk.com
15
Step 5
Once all of the electrical components are installed and
connected, tighten all of the Rail extension washer
screws using a 3mm Allen wrench.
Be careful not to over tighten to avoid stripping.
Step 4
Byrne Duplex receptacles are keyed to install one
way, make sure the “tab” on each Receptacle is fac-
ing up. Insert each Receptacle into one of the cavities
in the Power block and slide it outwards to lock it in
place.
Pull back on the Receptacles to ensure they
are locked in.
Snap a Faceplate into the opening and around the
Receptacles and repeat these steps for the remaining
Power blocks.
If one side of the Rail is not receiving Receptacles,
cover the opening with the included Blank faceplate.
Step 3
Carefully insert the Power block and Jumper assem-
bly down into the Rail housing, tilting it slightly to the
front or back side of the Rail to get it through the
opening at the top.
Once in place, attach the Power block from the bot-
tom of the Rail housing using four M5x12 screws.
Tighten using the 3mm Allen wrench, but be careful
not to over tighten to avoid stripping.
Note:
If you are planning to attach optional Wire trays,
do not tighten these screws all the way.