Uplift Desk Power & Data Rail Installation Instructions Manual Download Page 6

© UPLIFT Desk

 • 800-349-3839 • 512-614-3152 • [email protected] • upliftdesk.com

6

Pictured here: Short Rail 

(33.5” - 48.8” width adjustment between posts)

All rails come pre-assembled

Consisting of:

Cover

Rail housing

Rail extensions

(qty 2)

Also available: Long Rail

(51.5” - 73.8” width adjustment between posts)

Step 1

The Covers are not attached with screws during ship-
ment. Remove the Covers from each of the Rail as-
semblies and set them aside for later.  
Remove the hardware and other components from 
inside the Rail assemblies and set them aside for later 
also.

Step 2

Turn each Rail assembly over and loosen the two 

screws in each of the Rail extension washers using the 

3mm Allen wrench.  Do not remove the screws com-
pletely.

This will allow the Rail extensions to slide in and out of 

the Rail housing.

Step 3

Move one of the Rail assemblies to the first two Posts 
in your configuration. Slide the Rail extensions in or 

out as needed so that they can be hung on the Posts.

Note:

 Be sure that the upper and lower tabs on each 

Rail  extension  are  hooked  over  each  Post  top  and 

opening as shown.

Attach each Rail extension to each Post with an M5x12 

Machine screw and tighten using the 3mm Allen 
wrench.

M5x12 Screw

(qty 2)

Extension washer

(qty 2)

Parts needed for this part of the assembly

Assembly - Linear Configurations

Summary of Contents for Power & Data Rail

Page 1: ...assistance visit upliftdesk com call 800 349 3839 or email support upliftdesk com Patent Pending 2020 UPLIFT Desk All Rights Reserved 355lb two person assembly Power Data Rail Modular system for power...

Page 2: ...ckets PDC005 PRV Privacy Panels shipped separately Short wire trays PDC005 TRAY SHT Long wire trays PDC005 TRAY LNG Long rail assembly PDC005 RAIL LNG Short rail assembly PDC005 RAIL SHT Square post P...

Page 3: ...r access to power outlets is limited and eliminate cable clutter and the need for extension cords The Power and Data Rail was designed to position UPLIFT V2 and V2 Commercial desks with con sistent al...

Page 4: ...two M6x6 Set screws so the Upper post can slide If you are using the Power and Data Rail with UPLIFT V2 Commercial desks slide the Upper post until the bottom edge is aligned with the first indicator...

Page 5: ...t were included with each post to attach the feet as shown to the bot tom of each post assembly The oval power infeed hole should be facing to the left or right of the foot This way the holes will be...

Page 6: ...tep 2 Turn each Rail assembly over and loosen the two screws in each of the Rail extension washers using the 3mm Allen wrench Do not remove the screws com pletely This will allow the Rail extensions t...

Page 7: ...ng Posts and Rail assemblies down the row following Steps 3 and 4 above until all of the Rail assemblies are attached to the posts Then continue to move your UPLIFT V2 desks into place locating the de...

Page 8: ...be connecting Rail assemblies to other sides of the Square posts Follow the same Rail extension attachment process as shown in the section Assembly Linear Configurations Step 3 page 6 The type of pos...

Page 9: ...e Upper post until the bottom edge is aligned with the first indicator line For UPLIFT V2 frames slide the Upper post to the second indicator line Once in place tighten the Set screws again and con ti...

Page 10: ...ction box for hardwire pow er infeeds with the Power infeed hole facing the pow er source If you are assembling a Dog Bone Shape configura tion you will need two sets of 120 Degree and Square posts No...

Page 11: ...desks to create consistent spacing between the desks Dog Bone The Dog Bone configuration includes two 3 Pack con figurations bridged by pairs of 24 deep rectangular desks in between This example illu...

Page 12: ...ding a row of 42 desks but only 21 5 for a row of 72 desks Run your Power infeed in the orientation shown from the middle of the Rail through the Rail extension and down the Post that is nearest to th...

Page 13: ...re posts and will require two Jumpers to connect all three Rails Follow the Power infeed and Jumper installation pro cedures described in Steps 1 and 2 of this section You may find it helpful to tempo...

Page 14: ...ble after connection to Power block to ensure they are completely locked in place There are two Jumper connection points on each end of the Power block You can use either one or both as needed per you...

Page 15: ...es to ensure they are locked in Snap a Faceplate into the opening and around the Receptacles and repeat these steps for the remaining Power blocks If one side of the Rail is not receiving Receptacles...

Page 16: ...ac System can be wired in both single and three phase config urations 240 120V 208 120V respectively see Byrne 8 Trac wiring diagram below This power rail system utilizes 4 circuits 3 for general purp...

Page 17: ...B 15 panel mount solder style www Byrne com Step 1 If you are running data cables UL Listed DUXR or Recognized DUXR2 jacks are required Jacks and cables are not included PicktheDataplateadapterwhichwi...

Page 18: ...ng the in structions provided with the jack Step 4 Pullthefinishedcable jackthroughoneofthesquare holes in the Data plate from the back side Snap the jack into the one of the Data plate adapters you s...

Page 19: ...e M5x6 screws in the center of the Rail Cover and refer to the instructions that came with the Privacy panel brackets Step 2 If you re installing Wire trays refer to the instructions that come with th...

Page 20: ...the UPLIFT Desk website upliftdesk com Excerpts or copies may not be forwarded to third parties or used in any other published form without the prior written consent of UPLIFT Desk These instructions...

Reviews: