Uplift Desk Power & Data Rail Installation Instructions Manual Download Page 10

© UPLIFT Desk

 • 800-349-3839 • 512-614-3152 • [email protected] • upliftdesk.com

10

Step 3

Each 120-Degree post is used with three Square posts 

in 3-Pack and Dog Bone Shape configurations. Once 
the posts for a 3-Pack configuration are assembled, 
position  them  as  shown  to  the  left  approximately 

where they will be located once the Power and Data 
Rail assembly is complete.
Power infeeds can be introduced through the 120-De-
gree post or any of the Square posts. Locate the pow-
er infeed post close to the power outlet (for plug-in 

power infeeds) or the junction box (for hardwire pow

-

er infeeds) with the Power infeed hole facing the pow-
er source. 

If you are assembling a Dog Bone Shape configura

-

tion, you will need two sets of 120-Degree and Square 

posts. Note, in a Dog Bone configuration using UP

-

LIFT V2 Desks, two of the Square posts will need to 
have Dual row center feet (see circled). If the desks 
being used are not UPLIFT V2 Desks, we recommend 
using Dual row end feet like the other posts. 

Position the posts as shown to the left and approxi

-

mately where they will be located once the Power and 
Data Rail assembly is complete.

After the posts for either configuration are assembled 

and located where they need to be, move on to at-
taching your rails.

Dog Bone Shape Configuration

3-Pack Configuration

Summary of Contents for Power & Data Rail

Page 1: ...assistance visit upliftdesk com call 800 349 3839 or email support upliftdesk com Patent Pending 2020 UPLIFT Desk All Rights Reserved 355lb two person assembly Power Data Rail Modular system for power...

Page 2: ...ckets PDC005 PRV Privacy Panels shipped separately Short wire trays PDC005 TRAY SHT Long wire trays PDC005 TRAY LNG Long rail assembly PDC005 RAIL LNG Short rail assembly PDC005 RAIL SHT Square post P...

Page 3: ...r access to power outlets is limited and eliminate cable clutter and the need for extension cords The Power and Data Rail was designed to position UPLIFT V2 and V2 Commercial desks with con sistent al...

Page 4: ...two M6x6 Set screws so the Upper post can slide If you are using the Power and Data Rail with UPLIFT V2 Commercial desks slide the Upper post until the bottom edge is aligned with the first indicator...

Page 5: ...t were included with each post to attach the feet as shown to the bot tom of each post assembly The oval power infeed hole should be facing to the left or right of the foot This way the holes will be...

Page 6: ...tep 2 Turn each Rail assembly over and loosen the two screws in each of the Rail extension washers using the 3mm Allen wrench Do not remove the screws com pletely This will allow the Rail extensions t...

Page 7: ...ng Posts and Rail assemblies down the row following Steps 3 and 4 above until all of the Rail assemblies are attached to the posts Then continue to move your UPLIFT V2 desks into place locating the de...

Page 8: ...be connecting Rail assemblies to other sides of the Square posts Follow the same Rail extension attachment process as shown in the section Assembly Linear Configurations Step 3 page 6 The type of pos...

Page 9: ...e Upper post until the bottom edge is aligned with the first indicator line For UPLIFT V2 frames slide the Upper post to the second indicator line Once in place tighten the Set screws again and con ti...

Page 10: ...ction box for hardwire pow er infeeds with the Power infeed hole facing the pow er source If you are assembling a Dog Bone Shape configura tion you will need two sets of 120 Degree and Square posts No...

Page 11: ...desks to create consistent spacing between the desks Dog Bone The Dog Bone configuration includes two 3 Pack con figurations bridged by pairs of 24 deep rectangular desks in between This example illu...

Page 12: ...ding a row of 42 desks but only 21 5 for a row of 72 desks Run your Power infeed in the orientation shown from the middle of the Rail through the Rail extension and down the Post that is nearest to th...

Page 13: ...re posts and will require two Jumpers to connect all three Rails Follow the Power infeed and Jumper installation pro cedures described in Steps 1 and 2 of this section You may find it helpful to tempo...

Page 14: ...ble after connection to Power block to ensure they are completely locked in place There are two Jumper connection points on each end of the Power block You can use either one or both as needed per you...

Page 15: ...es to ensure they are locked in Snap a Faceplate into the opening and around the Receptacles and repeat these steps for the remaining Power blocks If one side of the Rail is not receiving Receptacles...

Page 16: ...ac System can be wired in both single and three phase config urations 240 120V 208 120V respectively see Byrne 8 Trac wiring diagram below This power rail system utilizes 4 circuits 3 for general purp...

Page 17: ...B 15 panel mount solder style www Byrne com Step 1 If you are running data cables UL Listed DUXR or Recognized DUXR2 jacks are required Jacks and cables are not included PicktheDataplateadapterwhichwi...

Page 18: ...ng the in structions provided with the jack Step 4 Pullthefinishedcable jackthroughoneofthesquare holes in the Data plate from the back side Snap the jack into the one of the Data plate adapters you s...

Page 19: ...e M5x6 screws in the center of the Rail Cover and refer to the instructions that came with the Privacy panel brackets Step 2 If you re installing Wire trays refer to the instructions that come with th...

Page 20: ...the UPLIFT Desk website upliftdesk com Excerpts or copies may not be forwarded to third parties or used in any other published form without the prior written consent of UPLIFT Desk These instructions...

Reviews: