Byrne
Jumpers
Power infeed
- Hardwire infeed -
- Plug-in infeed -
Dekko
Quantity and length
depends on configuration.
Available Lengths of Power infeed & Jumpers: between 12 and 1800 inches
Dekko
Byrne straight plug
Byrne right-angle plug
Byrne
Step 1
Standard Power infeeds are 72” long, but can be or-
dered longer if needed. Keep the Power infeed length
and Power source location in mind when planning
your space. There will be about 36.5” of the infeed
coming out of the post if you are building a row of 42”
desks but only 21.5” for a row of 72” desks.
Run your Power infeed, in the orientation shown, from
the middle of the Rail, through the Rail extension and
down the Post that is nearest to the Power source. Lift
up the plastic Inner sleeve that is covering the Power
infeed hole and pull out the end of the Power infeed.
Step 2
As a rule of thumb, required Byrne Jumper length
equals the distance between the midpoints of two
Rails, minus 10.25”. Feed the appropriate length
Jumper from the middle of one rail, through the Rail
extension, Post, and next Rail extension to the middle
of the next rail.
Continue on until all of the Jumpers are in place within
the Power & Data Rail assembly.
- or -
- or -
Parts needed for this part of the assembly
Electrical Assembly