![United States Stove Company Hot Blast HB1520 Owner’S Instruction And Operation Manual Download Page 4](http://html1.mh-extra.com/html/united-states-stove-company/hot-blast-hb1520/hot-blast-hb1520_owners-instruction-and-operation-manual_4025888004.webp)
4
© 2023 United States Stove Company
ASSEMBLY INSTRUCTIONS
TOOLS AND MATERIALS
The following is a list of tools and materials needed to
install your furnace.
• Safety glasses and gloves
• Various Hand Tools for component assembly. (Power
tools preferably)
• All Chimney and Chimney Connector materials required
for your particular installation.
• Electrical wiring tools and supplies
• All materials needed for Ductwork Installation (Supply
and return air) (Return Air Box is supplied with the unit)
UNPACKING
1. Remove all packaging from the furnace.
2. Remove the supplied parts from the furnace.
FIREBRICK CONFIGURATION
Inspect for any damage. Ensure that the bricks and
ash plug are positioned correctly and not broken (see
illustration for proper brick arrangement). NOTE: The
firebricks are silicone into place to prevent damage from
shipping. Attempting to remove the firebricks before
operation could result in damage.
CERAMIC FIBER BOARD CONFIGURATION
Inspect for any damage. Ensure the fiber board is
positioned correctly and not broken (see illustration for
proper fiber board arrangement). NOTE: The ceramic
fiber boards are silicone into place to prevent damage
from shipping. Attempting to remove the ceramic fiber
board before operation could result in damage.
ASSEMBLY OF FURNACE
Your furnace requires the following items to be assembled
or installed by the service person:
• Smoke Curtain
• Feed Door Handle & Latch
• Front Cover/Hood
• Distribution Blowers With Gaskets
• Junction Box Bracket
• Junction Box and Fan Center
• Draft Blower
• Honeywell Probe
• Filter Box
• Electrical Connections
JUNCTION
BOX
DISTRIBUTION
BLOWERS
HONEYWELL
LIMIT SWITCH
DRAFT
BLOWER
FOR CUSTOMER SERVICE CALL: 800-750-2723 EXT 5050