How to View Cost Report
From the EDGE2Print toolbar click
Cost Report.
The Cost Report will be displayed within a text file. Notice that the 3
PDF files are in the job and each are separately calculated. The
TOTAL COST
of all jobs is calculated at the bottom
of the page along with the
TOTAL LENGTH
.
STEP 1 of 3
To view cost report, click
Cost Report
from the toolbar
STEP 2 of 3
The following window will pop up. This is the cost report for the last printing job.
There are three different types of job costing given:
Total Toner Cost
= This is the cost of toner ONLY
Total Cost Per Label
= This takes into account the wear and tear done on the drums, transfer belt and fuser. It also
adds in the cost of the media based on the length of material used.
Total Cost Per Job
= This is the total cost for the amount of labels you selected to be printed, including the toner,
drums, transfer belt, fuser and media.
71