61
4.The exit point for the refrigerant pipes and electrical cables can be selected
from those shown in the figure.
5. Screw, the screws (1) to the sides of the unit required to hang it on the brac-
kets (2).
6. Hang the unit and tighten the screws.
7. Make sure that it is firm by moving it towards the left and right.
8. Hook up the connection pipes with those of the interior unit, lubricating the
flares with coolant oil and carefully covering the joint with thermal insulating
material.
9. Connect the condensation drain pipe to the fitting of the collecting tray (1)
pulling it out of the hole drilled in the wall. Depending on individual
requirements, this pipe may also be routed in other directions, provided that it slo-
pes sufficiently to allow the condensation to flow down.
Installation instructions