Operation
1-10
IMPORTANT: Do not release tension from ratch-
ets once they are set. They should only be
released when removing tarp from box.
1. To operate tarp, remove retaining pin from
crank holder. With both hands, carefully re-
move crank from the holder. Extend crank
handle assembly to a comfortable operating
position at back of box. Roll tarp entirely to the
open or closed position. Proceed by placing
crank in holder and reinsert pins.
2. Always use adequate caution when operating
tarp.
3. Make sure nobody is on or near the tarping
system while operating tarp.
4.
Always use both hands with feet on a solid sur-
face while operating the tarp.
TARP
5. Do not exert extreme force to roll tarp open or
closed. If tarp is covered with grain or snow, it
must be removed before operating.
6. End caps must be free from grain that may be
piled on them.
7.
Tarp should be fully closed when in trapsort.
8.
Insert snap pins whenever removing or placing
crank in holders.
9. Periodic preventive maintenance should be
practiced to maintain the tarp’s ability to function
and prolong its life. Inspect tarp and hardware
often for abrasions or loosened bolts that may
need to be adjusted and/or repaired. Check
cables for wear and adjust tension whenever
needed. Make all appropriate repairs or adjust-
ments immediately before serious damage oc-
curs.
Summary of Contents for Unverferth 2750
Page 12: ...12 NOTES March 2013...
Page 28: ...Operation 1 16 NOTES...
Page 42: ...2 14 Service MASTER DISCONNECT SWITCH ELECTRICAL SCHEMATIC...
Page 44: ...2 16 Service TRAILER LIGHTING BRAKE ELECTRICAL SCHEMATIC...
Page 45: ...2 17 Service SEED TANK LIGHTING ELECTRICAL SCHEMATIC...
Page 46: ...2 18 Service NOTES...
Page 64: ...3 18 Assembly NOTES...
Page 65: ...4 1 Parts SECTION IV PARTS...
Page 66: ...4 2 Parts OM04430 BOX DECALS 14 14 15...
Page 68: ...4 4 Parts LADDER COMPONENTS OM 04435...
Page 70: ...4 6 Parts DOOR WINDOW PIVOT COMPONENTS OM04431 Revised 082310 1 February 2013...
Page 74: ...4 10 Parts HOPPER COMPONENTS FOR 6 TUBE CONVEYOR OM04428 February 2013...
Page 78: ...4 14 Parts IDLER END COMPONENTS FOR 6 TUBE CONVEYOR OM04427 26 February 2013...
Page 80: ...4 16 Parts IDLER END COMPONENTS FOR 8 TUBE CONVEYOR February 2013...
Page 82: ...4 18 Parts DISCHARGE SPOUT COMPONENTS FOR 6 TUBE CONVEYOR OM04426 Revised 082310 1...
Page 84: ...4 20 Parts DISCHARGE SPOUT COMPONENTS FOR 8 TUBE CONVEYOR OM04539B...
Page 94: ...4 30 Parts CABLE RETURN TARP SYSTEM COMPONENTS February 2013...
Page 100: ...4 36 Parts AXLE WHEEL COMPONENTS Revised 082310 1...
Page 102: ...4 38 Parts UNDERCARRIAGE ELECTRICAL COMPONENTS 24896 WIRING HARNESS...
Page 108: ...4 44 Parts OPTIONAL GOOSE NECK HITCH COMPONENTS Front View Rear View February 2013...
Page 111: ...4 47 Parts NOTES February 2013...
Page 112: ...L MANUALS SEEDTENDER 27260 INDD MARCH 2013 3 JUNE 2014 4 MARCH 2015 4 www unverferth com...