![Ulvac MBS-C Instruction Manual Download Page 27](http://html1.mh-extra.com/html/ulvac/mbs-c/mbs-c_instruction-manual_3566014027.webp)
CRYO METER MBS-C Instruction Manual
ULVAC CRYOGENICS INCORPORATED
15
Supplement 1. Assembling IO Connector and Connecting to MBS-C
1. The Connector-kit
If no cable-option is specified, the Connector-kit shall be attached to MBS-C for “I/O” connecting.
Fig. 1-A shows the package view.
The package includes all the parts you need.
Fig. 1-B displays the contents.
You will not use two tapping screws (size: 2.9)
in the Hood package.
(*1)
Also, you will not use nuts and washes in the
lide locking device package.
(*2)
Fig. 1-A
S
Connector-kit Package (Part No. 72D15F-S)
15
D-SUB Plug
) Slide locking d
Hood
(1)
0967 015 47
(2
evice
0967 015 0511
(3)
0967 000 9915
Fig. 1-B Parts in the Package
(*1)
oles of the hood. If the tapping is not enough, you can make taps by
2)
Nuts and washes are for another connector-clamper.
The screws are to tap connector-h
yourself with using these screws.
(*
Summary of Contents for MBS-C
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 10: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 34: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 36: ...Revision History This page intentionally left blank R 2 ULVAC CRYOGENICS INCORPORATED...