F-2
ULVAC CRYOGENICS INCORPORATED
of the breakdown is found to be a fault of ULVAC CRYOGENICS.
(2)
Damage during transportation
When damage by delivery/transportation is admitted, the product will be
repaired free of charge within the range of the guarantee expressed in the sales
contract.
(3)
Breakdown repairs
There will be a charge for breakdown repairs, replacements and on-site visits
for the following seven conditions. In those cases the cost shall be your own
expense even though the product is within the warranty period.
①
Breakdowns due to improper storage or handling, careless accident, software
or hardware design by the customer.
②
Breakdowns due to modifications of the product without consent of the
manufacturer.
③
Breakdowns due to maintenance of the product without authentic parts or
breakdowns resulting from using the product outside the specified
specifications of the product.
④
Breakdowns due to contamination or corrosion caused by user’s use
conditions.
⑤
Breakdowns due to natural disasters (such as fire, earthquake, flood,
lightning, salt damage, and so on) , environmental pollution, irregular voltage,
and /or usage of undesignated power source.
⑥
Breakdowns that are outside the terms of warranty.
⑦
Consumables and/or replacement service.
Since the above services are limited to within Japan, diagnosis of failures, etc are
not performed abroad. If you desire the after service abroad, please contact
ULVAC CRYOGENICS and consult us for details in advance.
2.2 Exclusion of opportunity loss from warranty liability
Regardless of the gratis warranty term, compensation to opportunity losses
incurred to your company or your customers by failures of ULVAC CRYOGENICS
products and compensation for damages to products other than ULVAC
CRYOGENICS products and other services are not covered under warranty.
Summary of Contents for C30VR Series
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 16: ...S 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 18: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 108: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 110: ...Revision History R 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...