![Ultrak CCU-100HD User Manual Download Page 51](http://html1.mh-extra.com/html/ultrak/ccu-100hd/ccu-100hd_user-manual_3471538051.webp)
3-1
SECTION 3. OPERATION
3.1
CONTROLS AND INDICATORS
The only control on the CCU is the power input selection on the rear panel. The
power input is selectable between 110 Vac and 220 Vac. The switch can be
changed between 110 and 220 using a small flat blade screwdriver. If the power
input is changed, ensure the correct fuse is installed. See Section 1, paragraph
1.3 of this manual for the fuse values.
The only indicator on the CCU is the power indicator on the front panel. When
power is applied to the unit, the power indicator lights green.
3.2
OPERATING PROCEDURE
The operation of the CCU depends on the type of interconnecting equipment
being used, the control data sent to the CCU for processing, and the
programming of the CCU by the user. One or more operators can manually
control the system using the JPD-100 Controllers, KBD-100A Keyboard, or SHB-
100 ShotBox Units. The CCU can be programmed to automatically control the
system by responding to alarm inputs and time.
3.2.1
JPD-100 Controller Interface
All operator control data entered at a JPD-100 Controller is sent to the CCU.
The CCU processes all control commands and sends data out the
appropriate channels to perform the requested actions. The CCU gives
control of a FastScan/SmartScan unit or receiver to the last operator or
MultiCall that requests control. The video switching control data is sent out
COM2 to the Ultrak video switcher, all FastScan/SmartScan and receiver
control data is sent out channels 4, 6, and COM2. Auxiliary Control data for
Summary of Contents for CCU-100HD
Page 16: ......
Page 24: ......
Page 31: ...Figure 2 1 MODEL CCU 100 HD or CCU 100 HD X EQUIPMENT BLOCK DIAGRAM...
Page 39: ...Figure 2 3 EQUIPMENT CONNECTIONS FOR CHANNELS 1 2 AND 3 NEAR CLOSE OPEN FAR...
Page 41: ...Figure 2 4 EQUIPMENT CONNECTIONS FOR CHANNELS 4 AND 6...
Page 43: ...Figure 2 5 1 EQUIPMENT CONNECTIONS FOR CHANNEL 5...
Page 44: ...Figure 2 5 2 EQUIPMENT CONNECTIONS FOR CHANNEL 5...
Page 45: ...Figure 2 5 3 EQUIPMENT CONNECTIONS FOR CHANNEL 5...
Page 48: ......
Page 49: ...2 25...
Page 50: ...2 26...
Page 68: ......
Page 112: ......
Page 126: ...A 12 PRESHOT PROGRAMMING LOG Page ___ of ___ CAMERA NUMBER _____ PreShot Name Coverage...
Page 130: ...A 16 AIU 100 ALARM LOG Page ___ of ___ AIU ___ Alarm MultiCall Description of MultiCall...
Page 132: ...A 18 MULTICALL LOG Page ___ of ___ MultiCall Assigned To Description...
Page 146: ......