ULTRAFEED VAF-4
7-6 ASSEMBLY PROCEDURE Manual 0-5332
7.05 Installing Main ON/ OFF Switch and Circuit Breakers
1. Push the Main ON/ OFF Switch forward.
2. Reconnect the terminal to the Main ON/ OFF Switch.
3. Place the Circuit Breaker and install the plastic caps to secure it.
4. Reconnect the terminals to the Circuit Breaker.
2
4
Art # A-12824
1
3
Figure 7-7 Installing Main ON/ OFF and Circuit Breakers