
Commissioning
Connecting the devices to a Rockwell PLC with EtherNet/IP™
102
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | [email protected] | www.turck.com
Select the PLC.
Click
Go online
.
Fig. 61: Going online with the device
Click
Download
In the following dialog (Connect To Go Online)
Confirm all following messages.
a
The project is loaded down to the controller. The connection is established.