65
2018/03
The module is now connected to the PLC and the PLC is running.
In the project tree, under “Watch and force tables”, select “Add New Watch Table”.
Add I/O to the watch table.
Click the “Monitor all” icon to monitor the selected I/O.
Fig. 71: TIA-Portal – PLC running
Fig. 72: TIA-Portal – watch table