Operating Spanner Modules at PROFINET (Port 2 only)
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | [email protected] | www.turck.com
64
Select the correct PLC and click “Load”.
Follow the prompts.
Once the “Load results” window is loaded check the “Start all” radio button and click “Finish”.
Click "Go online".
Fig. 69: TIA-Portal – downloading the project
Fig. 70: TIA-Portal – Load results