![Troxler EGauge 4590 Manual Of Operation And Instruction Download Page 50](http://html1.mh-extra.com/html/troxler/egauge-4590/egauge-4590_manual-of-operation-and-instruction_1172540050.webp)
4–4
Figure 6. Marking the Test Area
7
7
.
.
Carefully pick up the scraper plate. Be careful not to disturb
the soil around the hole.
8
8
.
.
Position the Gauge on the prepared area inside the
markings.
9
9
.
.
To ensure correct positioning of the Gauge, lower the
source rod into the prepared hole.
Use care when
inserting the source rod; do not to disturb the soil
around the hole.
1
1
0
0
.
.
Raise the source rod back to the SAFE position.
1
1
1
1
.
.
You are now ready to perform your measurement
NOTE:
Perform the standard count at least once a day.
The best practice is to perform the standard count at
the jobsite on the first test site of the day.
Summary of Contents for EGauge 4590
Page 9: ......
Page 18: ...xvi NOTES...
Page 24: ...1 6 Figure 1 4590 Gauge and Standard Accessories...
Page 26: ...1 8...
Page 70: ......
Page 94: ...6 4...
Page 104: ......
Page 164: ......
Page 168: ......
Page 171: ...Model 4590 F 3 Standard Count Log Gauge Serial Number Date DS BGD Date DS BGD...
Page 174: ......
Page 186: ...Notes NOTES...