2HJ/2HK
2-2-1
2-2 Electrical Parts Layout
2-2-1
Electrical parts layout
(1) Main frame and controller box
Figure 2-2-1Main frame and controller box
1.
Main controller PWB .................................... Controls the software such as the print data processing and provides the
interface with computers.
2.
Engine controller PWB................................. Controls printer hardware such as high voltage/bias output control, paper
conveying system control, and fuser temperature control, etc.
3.
Power supply PWB ...................................... Generates 3.3 V DC, 5V DC and 24 V DC power source. Controls the
fuser heater lamp 1 and 2*
1
4.
LED print heads relay PWB ......................... Consists the LED print head control circuit and wiring relay circuit
between engine controller PWB and drum units.
CONTROLLER BOX
Summary of Contents for CLP3316
Page 1: ...Service Manual Color Printer CLP 3316 CLP 3520 X First Edition Date 24 10 2006 2HKSM060 ...
Page 2: ...Service Manual Color Printer CLP 4316 CLP 4520 X First Edition Date 24 10 2006 2HKSM060 ...
Page 6: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 20: ...2HJ 2HK 1 1 8 This page is intentionally left blank ...
Page 32: ...2HJ 2HK 1 2 12 This page is intentionally left blank ...
Page 138: ...2HJ 2HK 1 6 4 This page is intentionally left blank ...
Page 168: ...2HJ 2HK 2 1 30 This page is intentionally left blank ...
Page 172: ...2HJ 2HK 2 2 4 This page is intentionally left blank ...
Page 188: ...2HJ 2HK 2 4 6 This page is intentionally left blank ...