MATT™ Routine Inspection Checklist 

(File with Maintenance Records) 

 

Performed by:    

  

Date: 

 

 

Location:            

 

Trinity Highway recommends the state/specifying agency develop and administer their own 
end terminal inspection program, based on location of unit, volume of traffic and impact 
history. 

IMPORTANT: 

The 

MATT™

 and all of its components shall be inspected for 

damage after every impact

Repair using only Trinity Highway parts that are 

specified for use within this 

MATT™

 Product Description Assembly Manual.

 

 

 

If  no  end  terminal  inspection  program  exists,  Trinity  Highway  recommends  visual  drive-by 
inspections  at  least  once  every  month  and  walk-up  inspections  every  six  (6)  months.    These 
inspections shall, at a minimum, consist of: 

Visual Drive-By Inspections 

(Recommended Frequency: Monthly) 

  Check for damage caused by vehicle impacts. 

  Check for damage caused by impacts from snowplow, mowing or roadway operations. 

  Check for misalignment. 

  Check for missing system components. 

  Check for vandalism. 

  Check for damage caused by adverse weather conditions (i.e. erosion, weight of snow, UV). 

  Check that the anchor cable appears taut. 

 

Walk-Up Inspections (Recommended Frequency:  Every Six (6) Months) 

 

Walk-Up Inspections include ALL Visual Drive-By Inspection items (listed above) as well as 
the items listed below. 

 

  Ensure required traffic control is in place to conduct walk-up inspection. 

  Clear and dispose of any debris or trash found on the 

MATT™

 site, which may interfere 

with the performance of the 

MATT™

  Check that fasteners are fully tightened.  See Step 16 for torqued nut locations.  All 

other locations are to be tightened to a snug position with a minimum of two (2) bolt 
threads protruding beyond the nut. 

  Check for erosion to the site grading around the system. 

  Ensure that the 

MATT™ 

Anchor Cable is taut and the Bearing Plate is properly positioned. 

  Ensure the 

MATT™

 Panels are lapped correctly to allow them to telescope. 

If any of the above items are identified during the inspection process, swift action shall be taken 
to  correct  and  repair  the 

MATT™

  to  working  condition  as  outlined  in  the 

MATT™

  Product 

Description Assembly Manual, latest edition. 

 

 

Summary of Contents for MATT

Page 1: ...PN 628155 Created February 2022 MATT Median Attenuating TREND Terminal Assembly Manual TRINITY HIGHWAY Ahead of the Curve...

Page 2: ...These instructions are for standard assembly specified by the appropriate highway agency In the event the specified system assembly maintenance or repair would require a deviation from standard assemb...

Page 3: ...gent double sided re directive gating and energy absorbing attenuator end terminal for use with various longitudinal highway barriers in either unidirectional or bidirectional traffic applications to...

Page 4: ...sembly Posts 3 to 5 24 STEP 6 MATT 12 Gauge Transition Guardrail With Fin 4 9 4 1 2 2 858 m 25 STEP 7 MATT 12 Gauge Slotted Intermediate Guardrail With Fin 3 6 3 1 905 m Posts 4 5 26 STEP 8 MATT 12 Ga...

Page 5: ...onal Highway System OSHA Occupational Safety Health Administration PPE Personal Protective Equipment SYTP Steel Yielding Terminal Post TL 3 Test Level 3 Trinity Highway Trinity Highway Products LLC Cu...

Page 6: ...oval proper installation and maintenance of any highway product is the sole responsibility of the state specifying agency WARNING Under NO circumstances shall the rail within the MATT be curved radius...

Page 7: ...ead MATT CR top and bottom posts MATT SYTP with soil plate MATT system line post with soil plate MATT angle strut MATT cable assembly MATT spacers composite offset blocks and various other required ha...

Page 8: ...aint and Pen Straight Edge Level Plumb Line Post Pounder commonly used for driving posts Auger Soil Tamper 5 8 Alignment Tool Drift Pin used to help align panels Locking Pliers and or Pipe Wrench Cali...

Page 9: ...ircumstances shall the rail within the MATT be curved between Post 1 and Post 6 Ensure all MATT post spacings are 6 3 1 905 m on center IMPORTANT When used with rigid barriers i e concrete barrier wal...

Page 10: ...ided around the posts and filled with the state specifying agency approved backfill material If solid rock is encountered at post locations 3 6 refer to the state specifying agency guidelines and or t...

Page 11: ...0G 16 V 5 8 x 2 Hex Bolt A307 16 mm x 51 mm 3403G 6 W 5 8 x 2 GR Bolt Grade 5 A325 16 mm x 51 mm 118614G 62 Y 5 16 Hex Nut 8 mm 3245G 2 Z 5 8 Heavy Hex Nut A563 16 mm 3361G 66 AA 5 8 Round Washer 16 m...

Page 12: ...lowing components hardware are not shown to scale ID A PN 628342B ID B PN 628289A ID C PN 628337A MATT Impact Head MATT 12 Gauge Transition Guardrail With Fin 4 9 4 1 2 MATT 12 Gauge Slotted Intermedi...

Page 13: ...king Plate MATT CR Post 1 Top MATT CR Post 1 Bottom ID M PN 628271G ID N PN 628270G ID O PN 628279G MATT SYTP 6 0 MATT Line Post 6 0 MATT Angle Strut ID P PN 119506G ID Q PN 33909G ID R PN 628348G MAT...

Page 14: ...ID V PN 3403G ID W PN 118614G ID Y PN 3245G 5 8 x 2 Hex Bolt A307 16 mm x 51 mm 5 8 x 2 GR Bolt Grade 5 16 mm x 51 mm 5 16 Hex Nut 8 mm ID Z PN 3361G ID AA PN 4372G ID BB PN 3340G 5 8 Heavy Hex Nut A5...

Page 15: ...8273G 5 16 Flat Washer 8 mm 8 200 mm Composite Offset Block MATT Soil Plate Posts 1 2 ID NN PN 628269G ID OO PN 113660G ID TT PN 3500G MATT Soil Plate W Shaped Posts 3 6 5 8 x 3 50 Hex Bolt Grade 5 A3...

Page 16: ...is fully assembled for Steps 5A and 5B tighten the double single spacers to a snug position with a minimum of two 2 bolt threads protruding beyond the nut for all hardware that was assembled loosely...

Page 17: ...ht of the MATT CR Post 1 Bottom is 4 100 mm 1 0 25mm 0 mm above finished grade Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do...

Page 18: ...MATT CR Post 1 Bottom With Soil Plate is 4 100 mm 1 0 25 mm 0 mm above finished grade T 3391G 2 EA BB 3340G 2 EA MM 628273G 1 EA Use only Trinity Highway parts that are specified herein for the MATT...

Page 19: ...e approximately at finished grade 1 0 25 mm 0 mm BB 3340G 2 EA MM 628273G 1 EA OO 113660G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repai...

Page 20: ...he SYTP Holes are approximately at finished grade 1 0 25 mm 0 mm BB 3340G 6 EA NN 628269G 3 EA OO 113660G 6 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling main...

Page 21: ...Post 6 at location established in Step 1 BB 3340G 2 EA NN 628269G 1 EA OO 113660G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the...

Page 22: ...g maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems are Trinity Highway systems WARNINGS Ensure the flat washer is between the bolt...

Page 23: ...rinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems are Tr...

Page 24: ...only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems...

Page 25: ...A AA 4372G 6 EA BB 3340G 6 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from ot...

Page 26: ...2 EA TT 3500G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems...

Page 27: ...ed grade J 628338G 2 EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not uti...

Page 28: ...EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise co...

Page 29: ...G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle part...

Page 30: ...1 0 25 mm 0 mm above finished grade J 628338G 2 EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or re...

Page 31: ...and hooked over the MATT CR Post 1 Top Q 33909G 1 EA CC 4902G 2 EA DD 3910G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT...

Page 32: ...p W 118614G 8 EA Z 3361G 8 EA CC 4902G 8 EA EE 118615G 8 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or oth...

Page 33: ...ications comply with MUTCD requirements or comply with state specifying agency requirements YY 105379B 1 EA OR ZZ 105380B 1 EA Use only Trinity Highway parts that are specified herein for the MATT for...

Page 34: ...EA Z 3361G 2 EA EE 118615G 2 EA 628342B from Step 13 Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise...

Page 35: ...d the MATT 10 Gauge Head Rails back evenly Z 3361G 4 EA EE 118615G 4 EA 628342B from Step 13 Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairi...

Page 36: ...ered taut when it does not deflect more than 1 25 mm when pressure is applied by hand in an up or down direction Use only Trinity Highway parts that are specified herein for the MATT for assembling ma...

Page 37: ...l Plate using the upstream hole in the post p 24 12 Ensure all MATT Guardrails are installed 31 787 mm 1 0 25 mm 0 mm from finished grade pp various 13 Ensure all MATT 12 Gauge Transition Guardrails W...

Page 38: ...m components Check for vandalism Check for damage caused by adverse weather conditions i e erosion weight of snow UV Check that the anchor cable appears taut Walk Up Inspections Recommended Frequency...

Page 39: ...g Detail Detail derived from information contained in the AASHTO Roadside Design Guide 4 th Edition 2011 IMPORTANT Trinity Highway does not direct grading Proper site grading must be accomplished befo...

Page 40: ...derived from information contained in the AASHTO Roadside Design Guide 4 th Edition 2011 IMPORTANT Trinity Highway does not direct grading Proper site grading must be accomplished before assembly of t...

Page 41: ...TrinityHighway com February 2022 NOTES...

Page 42: ...TrinityHighway com February 2022 NOTES...

Page 43: ...TrinityHighway com February 2022 NOTES...

Page 44: ......

Reviews: