
ALUMINUM FRAME INSTALLATION
The 3258's 2-5/8" x 5/8" full lip faceplate requires the least
amount of jamb preparation when compared with other
electric strikes with an auxiliary ramp.
Figure 7 shows how much less cutting is needed by our
3258 electric strike.
FIGURE 7
3258 Frame Preparation
1 9/16"
9/16"
2 5/8"
5/8"
2 1/8"
FIGURE 8
3258 Template
FIGURE 8a
OPTIONAL
1/16" THICK
SHIM
2 5/8"
2 7/16"
5/8"
13/16"
2 1/8"
1 11/16"
1 1/32"
1 11/16"
1"
1/8"
ALUMINUM FRAME INSTALLATION
The 3458's 4-5/8" x 1-9/16" full lip steel faceplate requires the
least amount of jamb preparation when compared with other
electric strikes with an auxiliary ramp. The full lip design
acts as a trim plate by wrapping around the frame edge.
Figure 5 shows the required cutting.
FIGURE 5
3458 Frame Preparation
4 5/8"
2 1/16"
5/8"
1 9/16"
9/16"
1/2"
3/32"
4 1/8"
FIGURE 6
3458 Template
1 11/16"
1 1/32"
15/32"
7/64"
1 15/16"
4 5/8"
3/4"
1 1/8"
4 1/8"
1 3/4"
3/4"
9/16"
3/32"
1/4"
1"
OPTIONAL
1/16" THICK
SHIM
FIGURE 6a
Page 5
Summary of Contents for 4100 Electric Strike
Page 25: ......