5
Ensure sufficient lifting height can be achieved and is available on site. If not a lifting bar as per option 2 is
required.
Option 1*
Option 2*
6.
Tanks which are greater than 4 modules (4.6m) in length should be lifted using the slings provided as per
option 3, shown below.
Option 3*
Ensure sufficient lifting height can be achieved and is available on site. If not a lifting bar as per option 4 is
required.
Option 4*
Ensure the slings are positioned at a joint on the tank, firmly secured and the load is evenly balanced.
*Typical lifting examples