VII Gas Piping
Gas piping to the boiler must be sized to deliver adequate gas for the boiler to fire at the nameplate input at an
inlet pressure between the minimum and maximum values shown on the rating plate. For more information on
gas line sizing, consult the utility or the
National Fuel Gas Code
.
Figure 7.1 shows typical gas piping connection to the TRIUMPH boiler. A sediment trap must be installed
upstream of all gas controls. Install the factory provided manual shut-off valve outside the jacket with a
ground joint union as shown.
The boiler and its gas connection must be leak tested before placing the boiler in operation. When doing this,
the boiler and its individual shut-off must be disconnected from the rest of the system during any pressure
testing of that system at pressures in excess of 1/2 psi. When pressure testing the gas system at pressures of
1/2 psi or less, isolate the boiler from the gas supply system by closing its individual manual shut-off valve.
Figure 7.1: Gas Connection To Boiler
33
Summary of Contents for Triumph series
Page 2: ......
Page 34: ...32 FIGURE 6 23 CONDENSATE PIPING ARRANGEMENT ...
Page 48: ...46 Figure 8 14 Multiple Boiler Piping ...
Page 50: ...Figure 9 1 Wiring Connections Diagram 48 ...
Page 51: ...Figure 9 2 Ladder Diagram 49 ...
Page 69: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Page 71: ...69 ...
Page 72: ...70 ...
Page 73: ...71 ...
Page 75: ...73 ...
Page 76: ...74 ...
Page 78: ...76 ...
Page 79: ...77 ...
Page 82: ...80 ...
Page 83: ...81 155 156 158 157 160 159 ...
Page 84: ...82 161 162 164 163 166 165 ...
Page 85: ...83 167 ...