TABLE 6.4: PERMISSIBLE STAINLESS STEEL VENT SYSTEMS AND PRINCIPLE VENT
COMPONENTS (VENT OPTIONS 1,2,3,7,8,9)
MANUFACTURER VENT SYSTEM SIZE
WALL
THIMBLES
HORIZONTAL
TERMINATION
VERTICAL
TERMINATION
HEAT FAB
SAF-T VENT
EZ SEAL
4
9493
9493S
5491CI
TRIAD TERMINAL: 230513
9492
5
5591CI
TRIAD TERMINAL: 230514
9592
PROTECH
SYSTEMS
INC.
FASNSEAL
4
FSWT4
TRIAD TERMINAL: 230513
FSBS4
5
FSWT5
TRIAD TERMINAL: 230514
FSBS5
Z-FLEX
Z-VENT
SINGLE WALL
4
2SVSWTX04
TRIAD TERMINAL: 230513
2SVSTPF04
5
2SVSWTX05
TRIAD TERMINAL: 230514
INSTALLER TO
PROVIDE STAIN-
LESS STEEL 1//2”
(2X2) OR GREATER
MESH
METAL-FAB
CORR/GUARD
4
CGSWWPK(4”)
TRIAD TERMINAL: 230513
CGSWHTM(4”)
5
CGSWWPK(5”)
TRIAD TERMINAL: 230514
CGSWHTM(5”)
Notes:
1) T300 requires stainless steel vent adaptor kit P/N 230557 when used with the above stainless steel vent systems.
2) See vent system manufacturer’s literature for other part numbers that are required such as straight pipe, elbows, firestops, and vent sup
-
ports.
6)
Permitted Terminals for Vertical Venting
-
Vent Options 7, 8, 9 – A straight termination is installed in the end of the exhaust pipe. Vent manufacturer’s part
numbers for these terminals are shown in Table 6.4. The air inlet terminal consists of a 180 degree elbow (or
two 90 degree elbows) with a rodent screen as shown in Figure 6.8.
Vent Option 10 – Use Triad PN 230570 with the appropriate flashing (Table 6.10).
7) Vertical Vent Terminal Locations (Vent Options 7,8,9&10)
- Observe the following limitations on the location of all
vertical vent terminals (see Figures 6.8 & 6.9):
• The top of the vent pipe must be at least 2 feet above any object located within 10 feet.
• For Vent Options 7, 8 & 9, the vertical distance between top of the vent and air inlet terminal openings must be at
least 12”.
• The bottom of the air inlet terminal must be at least 12” above the normal snow accumulation that can be expected
on the roof. The terminal used in Vent Option 10 has a fixed distance above the storm collar of 19”. If a greater
distance is needed to provide the clearance above the snow line, build a chase on the roof and mount the vertical
terminal on top of the chase.
• For Vent Options 7, 8 & 9, the air intake terminal must be located on the roof and must be no further than 24”
horizontally from the exhaust pipe.
8) Wall thimbles
– Wall thimbles are required where single wall vent pipe passes through combustible walls with less
than the required clearance shown in Table 4.2 or as required by local codes. Stainless vent manufacturer’s wall
thimble part numbers are shown in Table 6.4. Note that concentric vent has a “zero” clearance to combustibles and
therefore does not require the use of wall thimbles.
11
Summary of Contents for Triumph series
Page 2: ......
Page 34: ...32 FIGURE 6 23 CONDENSATE PIPING ARRANGEMENT ...
Page 48: ...46 Figure 8 14 Multiple Boiler Piping ...
Page 50: ...Figure 9 1 Wiring Connections Diagram 48 ...
Page 51: ...Figure 9 2 Ladder Diagram 49 ...
Page 69: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Page 71: ...69 ...
Page 72: ...70 ...
Page 73: ...71 ...
Page 75: ...73 ...
Page 76: ...74 ...
Page 78: ...76 ...
Page 79: ...77 ...
Page 82: ...80 ...
Page 83: ...81 155 156 158 157 160 159 ...
Page 84: ...82 161 162 164 163 166 165 ...
Page 85: ...83 167 ...