6
7
3
3
Route cables and housings through the frame
Route cables and housings through the frame
2.
Tighten the bolts to 1.2Nm.
3.
Install the storage cover with the lever pointing
to the drive side.
COVER CLOSED
4.
See the Appendix for the procedure:
Assemble
and install the down tube storage door.
B. Di2
Route the front derailleur cable
1.
Connect the front derailleur cable to the front
derailleur.
2.
Place the cable through the grommet, into the
hole at the bottom of the seat tube, and out
the bottom bracket.
3.
Set the grommet in place in the frame.
Route the rear derailleur cable
NOTE
The rear brake should be installed
and the hose routed up through the head tube.
Pro Builder Tip:
To help with this installation, use
the Park Tool IR-1.2 Internal Cable Routing Kit.
1.
Connect the rear derailleur cable to the rear
derailleur.
3.
Put the grommet around the derailleur housing
and insert the grommet into the bottom of the
drive side dropout.
4.
Place the housing in the stop on the rear
derailleur.
Install the down tube cable guide
1.
Slide the cable guide into the down tube
access hole and under the cables and hose.
2.
Snap the cables and hose into the guide clips
in the correct order and location (non-drive
side to drive side):
1.
Rear brake
2.
Front derailleur
3.
Rear derailleur
FRONT
DERAILLEUR
HOUSING
REAR BRAKE
HOSE
REAR
DERAILLEUR
HOUSING
3.
While holding the housing and hose at the
head tube, move the guide down the downtube
to line up the guide holes with the holes in the
bottom of the downtube.
4.
From the bottom of the down tube, use two
bolts to connect the cable guide to the frame.
Torque the bolts to 3Nm.
Install the down tube window frame
1.
Install the window frame in the down tube
storage hole.
NOTE
Make sure the window frame tab is
at the top of the storage hole.
Summary of Contents for Domane SL 2020
Page 1: ...2020 DOMANE SLR SL SERVICE MANUAL...
Page 16: ......